Refactor local InSAR asset and production workflows
This commit is contained in:
@@ -0,0 +1,63 @@
|
||||
# LandSAR DEM Preparation Contract
|
||||
|
||||
Updated: 2026-06-18
|
||||
|
||||
## Decision
|
||||
|
||||
LandSAR D-InSAR and LandSAR SBAS must not run directly against the full global DEM.
|
||||
|
||||
The maintained flow is:
|
||||
|
||||
1. Convert the global DEM once into an uncompressed Int16 GeoTIFF.
|
||||
2. Configure LandSAR with that global Int16 GeoTIFF as the DEM source.
|
||||
3. Before each LandSAR task executes, crop a task-level DEM from the global Int16 source.
|
||||
4. Write the task-level crop path into `200014.txt` or `280039.txt`.
|
||||
|
||||
The global Int16 file is a reusable source DEM. The actual LandSAR console input is the small crop stored under the run work directory.
|
||||
|
||||
## Paths
|
||||
|
||||
Prepared global DEM source:
|
||||
|
||||
```text
|
||||
D:\DEM\SRTMDEM_RSP_SARscape_global_int16.tif
|
||||
```
|
||||
|
||||
Runtime task crop location:
|
||||
|
||||
```text
|
||||
<run work root>\...\dem_crop\<task>_<bbox-hash>_dem.tif
|
||||
```
|
||||
|
||||
Production configuration:
|
||||
|
||||
```text
|
||||
LANDSAR_DEM_PATH=D:\DEM\SRTMDEM_RSP_SARscape_global_int16.tif
|
||||
LANDSAR_SBAS_DEM_PATH=D:\DEM\SRTMDEM_RSP_SARscape_global_int16.tif
|
||||
```
|
||||
|
||||
## Commands
|
||||
|
||||
One-time global conversion:
|
||||
|
||||
```powershell
|
||||
Set-Location D:\Code\Insar_management_system_v2; & C:\ProgramData\anaconda3\envs\InSAR\python.exe scripts\prepare_landsar_dem_int16.py --source D:\DEM\SRTMDEM_RSP_SARscape.wgs84 --target D:\DEM\SRTMDEM_RSP_SARscape_global_int16.tif --block-size 1024 --overwrite
|
||||
```
|
||||
|
||||
Optional manual crop test from the prepared global GeoTIFF:
|
||||
|
||||
```powershell
|
||||
Set-Location D:\Code\Insar_management_system_v2; & C:\ProgramData\anaconda3\envs\InSAR\python.exe scripts\prepare_landsar_dem_int16.py --source D:\DEM\SRTMDEM_RSP_SARscape_global_int16.tif --crop-only --bbox 120,42,136,54 --target D:\DEM\landsar_prepared\SRTMDEM_RSP_SARscape_ne_china_int16.tif --block-size 2048 --overwrite
|
||||
```
|
||||
|
||||
The manual crop command is for verification or emergency operation. Normal D-InSAR/SBAS production performs task-level cropping automatically.
|
||||
|
||||
## Guardrails
|
||||
|
||||
- `LANDSAR_DEM_PATH` and `LANDSAR_SBAS_DEM_PATH` point to the global prepared Int16 GeoTIFF source.
|
||||
- D-InSAR derives the crop bbox from master/slave LT-1 XML corner coordinates.
|
||||
- LandSAR SBAS derives the crop bbox from all selected `Input_Data` LT-1 XML corner coordinates.
|
||||
- The crop bbox is expanded by a margin before writing the task DEM.
|
||||
- The source DEM must be Int16; Float/ENVI sources are rejected at runtime.
|
||||
- Each crop writes a JSON manifest next to the crop tif.
|
||||
- Run metadata records both `dem_source_path` and the actual task `dem_path`.
|
||||
Reference in New Issue
Block a user