ISCE2 Stabilization Update Log

Date: 2026-04-27

Scope

This update hardens the managed ISCE2 LT-1 stripmap D-InSAR production path against large raw DEM reuse, long geocode stalls, and incomplete recovered-run metadata.

Delivered Changes

1. Managed ISCE2 pipeline hardening

  • Added --resume-from unwrap|geocode|export support to the LT-1 pipeline.
  • Added --full-geocode support. The default path now geocodes only the export-critical products instead of ISCE2's full default list.
  • Added stage-aware logging with stdout flush to improve long-run observability.
  • Added geocode DEM subset preparation so resumed geocode/export runs do not reprocess the full base DEM.
  • Added a guard that blocks fresh runs when the selected DEM resolves to a very large raw base raster without a prepared .wgs84 sibling.

2. Engine and runtime configuration fixes

  • ISCE2 now prefers an existing prepared .wgs84 DEM over the raw base path.
  • PyINT DEM resolution now follows the same prepared-first preference.
  • The WSL ISCE2 runner now passes resume_from and full_geocode through to the pipeline.
  • The WSL runner now sets both PROJ_DATA and PROJ_LIB.

3. Recovery and catalog self-healing

  • Added a completion-file repair helper for managed ISCE2 runs.
  • In-place ISCE2 publish/rebuild now repairs missing:
    • execution_manifest.json
    • current/isce2__<profile>.json
  • This allows recovered runs to be reintroduced into the managed result catalog without hand-editing completion markers.

4. One-time DEM preparation tooling

  • Added backend/app/isce2_pipeline/prepare_isce2_base_dem.py.
  • The script resolves DEM paths from .env, validates existing prepared outputs, and can generate a reusable WGS84 .wgs84 DEM from an EGM96 base DEM.
  • The script also auto-configures PROJ paths for standalone execution.

5. Configuration guidance

  • Updated .env.example comments to distinguish:
    • raw SARscape/ENVI DEM source path
    • prepared ISCE2/PyINT .wgs84 path

Validation

  • Python syntax validation was run for the modified ISCE2 pipeline, engine, runtime, and result-catalog modules.
  • The one-time full DEM preparation completed successfully and produced:
    • .wgs84
    • .wgs84.xml
    • .wgs84.vrt
  • The prepared DEM metadata was verified to report WGS84.

Required Local Follow-Up

These operational steps are intentionally not committed:

  • Point local .env ISCE2_DEM_PATH to the prepared .wgs84 file.
  • Point local .env PYINT_PREPARED_DEM_PATH to the same prepared .wgs84 file.
  • Restart the backend so the running process reloads the updated .env.