Files
insar-management-system-v2/experiments/isce2_sbas_timeseries/notes/PHASE0_SAMPLE_STACK_SELECTION.md
T

1.9 KiB

Phase 0 Sample Stack Selection

Updated: 2026-04-03

Selected baseline sample

Current baseline sample stack:

  • group key:
    • LT1A|STRIP1|HH|DESCENDING|E123.3_N46.1
  • manifest:
    • experiments/isce2_sbas_timeseries/configs/sample_stack_e123p3_n46p1.json

Sample summary

  • satellite:
    • LT1A
  • mode:
    • STRIP1
  • polarization:
    • HH
  • orbit direction:
    • DESCENDING
  • scene count:
    • 5
  • dates:
    • 20250118
    • 20250315
    • 20250510
    • 20250705
    • 20250830
  • recommended reference date:
    • 20250510
  • receiving stations observed:
    • SYC
    • KSC

Why this sample is useful

  • It already satisfies a minimal SBAS smoke-test stack size.
  • All scenes share the same:
    • satellite
    • imaging mode
    • polarization
    • orbit direction
    • tile key
  • The dates are evenly spaced enough to act as a first time-series experiment set.

Important adjacent-tile signal

This sample is not isolated.

The same date sequence also appears in multiple neighboring descending tiles, including:

  • E123.5_N46.6
  • E123.6_N47.0
  • E123.8_N47.5
  • E123.9_N48.0
  • E124.5_N49.9
  • E124.7_N50.3
  • E124.8_N50.8
  • E125.0_N51.3
  • E125.1_N51.8
  • E125.3_N52.2
  • E125.5_N52.7

These neighboring tiles share the same 5 acquisition dates:

  • 20250118
  • 20250315
  • 20250510
  • 20250705
  • 20250830

Implication

This strongly suggests the data pool contains a larger repeated strip-family, not just isolated scenes.

Recommended experiment order:

  1. Start with one tile-level stack smoke test using E123.3_N46.1.
  2. If stack-prep works, expand to multiple adjacent tiles with the same date family.
  3. Only after that, test a wider strip or mosaic strategy.

Current risk judgment

The main remaining uncertainty is still not scene selection.

The main uncertainty is:

  • how to convert LT-1 per-scene tiff + meta.xml folders
  • into a stack layout and sensor input form acceptable to the ISCE2 stripmap stack workflow